Preventative Maintenance
Beginning/end of day | Between extractions | Every ~200 extractions | Every ~400 extractions | Yearly | Procedure | |
|---|---|---|---|---|---|---|
Line-purging and re-priming | X | See "Daily Line Purge Procedure" article | ||||
Clean System | X | X | Flush all active lines with cleaning buffers (IPA/EtOH/MeOH). Run the "clean sys" method | |||
Deep Clean with 0.5-1.0M NaOH | X | X | Run a "clean sys" using alkaline wash buffer | |||
Pump Maintenance | X | X | See "Syringe Pump Cleaning" Guide | |||
Valve Cleaning | X | X | See "Valve Cleaning" Guide | |||
UV Flow-cell Cleaning | X | If you observe a high baseline or abnormal absorbance signal on the UV touchscreen, the flow cell cuvettes can be removed from the modules for cleaning. | ||||
Preventative Maintenance Kit installation | X | Reach out to support@promochrom.com for more information |